MIL-PRF-1/1701C
TABLE I. Testing and inspections - Continued.
Requirement or test
Method
Notes
Test
Conditions
Symbol
Limits
Unit
Min
Max
Conformance
inspection, part 1
13/
- Continued
4452
0.5
Leakage energy
erg
---
17/
2
Ws
erg
---
0.1
18/
Ws
(spike)
2
µs
---
4471
1.0
t
Recovery time
8/
3
30
4496
200
Firing power
1
14/
Po/Du
mw
---
Phase shift
1
See figure 7
5/ 6/
Ć∅
44.5
47.5
14/
F = F1
Degrees
Ć∅
346.0
349.0
F = F4
Degrees
Ć∅
309.5
312.5
F = F5
Degrees
Eso1 = 28 ± 0.5 V dc
---
435
Shutter current
---
---
19/
mA dc
Iso1
Eso1 = 28 ± 1 V dc;
---
Shutter cycling
---
---
---
20/
---
---
prr = 10 Hz (max);
250 cycles
Conformance
inspection, part 2
TA = +125°C and -55°C
µA dc
Ii
130
---
1/ 14/
Ignitor current
1
190
Nr
---
4460
Ignitor noise ratio
1
---
1.3
---
ĆNF
Noise figure change
1
---
---
---
1.2
dB
TA = +125°C
Leakage power (flat)
2
4452
---
17/
100
pf
mw
TA = +125°C
Leakage energy
2
4452
17/
---
0.5
Ws
erg
(spike)
TA = +125°C
Firing power
1
4496
14/
30
200
Po/Du
mw
µs
TA = -55°C
Recovery time
3
4471
8/
---
1.0
t
po = 20 ± 1 kw
Arc loss
2
4488
---
---
0.8
Loss
dB
Eso1 = 28 ± 0.5 V dc;
Shutter current
---
---
19/
---
435
Iso1
mA dc
TA = +125°C and -55°C
Shutter cycling
---
---
20/
---
---
Eso1 = 28 ± 1 V dc;
---
---
prr = 10 Hz (max);
TA = +25°C
1,000 cycles
Ć∅
---
0.2
Degree
po = 4 kw;
Phase recovery
1
---
8/ 9/
TA = -55°C
See footnotes at end of table.
3