MIL-PRF-1/160N
TABLE I. Testing and Inspection. -Continued.
NOTES: - Continued.
8. This test is to be the first test performed at the conclusion of the holding period.
9. Circuit and cavity shall be in accordance with Drawing 223-JAN (see note 13).
10. This test shall be made a minimum of 30 minutes after Ef is turned off. Rated airflow shall be maintained during the 30-
minute interval. Measurement to be made with General Radio Megometer Model No. 1862C, or equivalent. Unused
elements shall be left floating.
11. Tube type 7035 has been deleted from this tube specification sheet : use MIL-PRF-1/1331, type 7609.
12. This specification sheet uses accept on zero defect sampling plan, in accordance with MIL-PRF-1, table III.
13. Contact preparing activity if assistance is needed to find JAN drawings.
6
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business