MIL-PRF-1/422J
TABLE I. Testing and inspection - Continued.
9.
The deflection in this direction covers the minimum useful screen width following the bulb contour.
10. The deflection in this direction is limited to ± 0.75 inch (± 19.1 mm) minimum from the undeflected spot position.
11. This test to be performed at the conclusion of the holding period. This test applies only when P1 CRT screen phosphors are
specified.
12. Corresponding traces of each unit are to be within 2 degrees of each other.
13. This test is not required unless specified in the purchase order or contract.
14. The tube manufacturer (7YP2 only) shall provide the user with two years of service life warranty commencing with shipment
from the tube manufacturer. The second year of this warranty shall be pro-rated. Other terms and agreements regarding this
warranty (i.e., pro-rating, handling of defectives) shall be negotiated at the time of purchase. The appropriate applicable
documentation shall be provided by the tube manufacturer and this documentation shall accompany the tube. The user will
be responsible for completing and returning the documentation to the manufacturer.
15. This test shall be performed on 100 percent basis and torque shall be 20 inch-pounds (7YP2 only). Immersion test for
qualification only.
16. This specification sheet uses accept on zero defect sampling in accordance with MIL-PRF-1, table III.
5
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business