MIL-PRF-1/368G
TABLE I. Testing and inspection - Continued.
Inspection
Method
Notes
Test
Conditions
Symbol
Limits
Limits
Units
MIL-STD-1311
Min
Max
Conformance inspection, part 3
-Continued
Life-test end points:
---
s
Recovery time
4471
---
2
t
---
20
Flat leakage power
4452
---
2
pf
---
70
mw
Insertion loss
4416
---
---
F = F3; Ii = 0
Li
---
0.8
dB
Spike leakage energy
4452
---
2
Ws
---
0.3
erg
Temperature cycling life test
1027
---
---
Group C; 10 cycles
---
---
---
---
NOTES:
1.
This test to be performed at the conclusion of the holding period.
2.
With a metal plate shorting the line the position of the voltage standing wave minimum shall be determined. The metal
plate shall be replaced by the tube and the position of the voltage standing wave minimum of the flat portion of the pulse
shall be measured.
3.
The ignitor current shall not be adjusted during life test. Life-test end points shall be measured using a fixed voltage and
resistor.
4.
After this test, the following requirement shall be met: Recovery time (Method 4471).
5.
This specification sheet uses accept on zero defect sampling in accordance with MIL-PRF-1, table III.
3
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business