MIL-PRF-1/1005E
TABLE I. Testing and inspection.
Inspection
Method
Notes
Conditions
Symbol
Unit
Limits
MIL-STD-1311
Min
Max
Qualification inspection
Base material insulating
1216
---
Zone 5 (min)
---
---
---
---
quality
Cathode illumination
5216
---
---
---
---
---
Barometric pressure,
1002
---
21 mmHg
---
---
---
---
reduced
Pressure (implosion)
1141
---
---
---
---
---
Direct-interelectrode
1331
---
k to all
Ck
---
8.0
pF
capacitance
g1 to all
Cg1
---
10.0
pF
Vibration (cathode-ray
5111
---
Width
---
2.0
mm
tubes)
Shock
5115
---
---
---
---
---
Conformance inspection,
part 1
Bulb, screen, and
5106
---
---
---
---
---
faceplate quality
Voltage breakdown
5201
---
---
---
---
---
Voltage breakdown
5201
---
---
---
---
---
(magnetic deflection)
lb2 = 100 μA dc
ΔEc1
Modulation
5223
---
---
32
V dc
Spot position
5231
---
---
---
0.5
inch
(magnetic deflection)
Face tilt
5101
---
---
---
---
---
Grid cutoff voltage
5241
---
Ec1
-33
-77
V dc
Grid No. 1 leakage
5251
---
---
---
---
---
current
Anode No. 1 leakage
5251
---
---
---
---
---
current
Zero-bias anode current
5236
---
---
---
---
---
(magnetic deflection)
Gas ratio
5206
---
Gr
---
0.25
---
Neck straightness
5101
2/
---
---
---
---
lb2 = 100 μA dc
Focusing electrode
---
3/
Ec1
0
600
V dc
voltage
lb2 = 100 μA dc
Line width A
5226
3/
Width
---
0.55
mm
(magnetic deflection)
See footnotes at end of table.
2
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business