MIL-PRF-1/943E
TABLE I. Testing and inspection - Continued.
19/
Vary light to obtain approximately 10 microamperes of anode current.
20/
Tube shall operate without indication of breakdown in an evacuated chamber in which the pressure does not exceed 130
mmHg absolute.
21/
All conformance inspection, part 1, tests to be performed at the conclusion of the holding period.
5
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business