MIL-PRF-1/1669A(CR)
TABLE I. Testing and inspection - Continued.
23/
The tube shall be operable after each tuning mechanism is subjected to the tuning cycles specified, from one end of the tuning
range to the other and back again.
24/
Each electron tube shall be furnished with dust covers for protection of input and output connector elements.
25/
Unless otherwise specified in contract or order, each tube shall, as a minimum protection against moisture and moisture vapor, be
sealed within a moisture vaporproof-barrier bag, or equivalent, normally acceptable under packaging requirements of MIL-E-75.
5
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business