MIL-PRF-1/1655E
TABLE I. Test conditions - Continued.
12. The life-test sample shall consist of 20 tubes per lot and no tube failure shall be permitted. In the
event of rejection of the first sample, due to failure of any tube, a second sample of 20 tubes
shall be selected from the lot. Acceptance shall then be based on the second samples.
13. This specification sheet uses accept on zero defect sampling plan in accordance with MIL-PRF-
1, table III.
NOTE: Referenced documents. In addition to MIL-PRF-1, this document references the following:
MIL-STD-1311
Marginal notations are not used in this revision to identify changes with respect to the previous issue due to the
extent of the changes.
Custodians:
Preparing activity:
Army - CR
DLA - CC
Navy - EC
Air Force - 11
(Project 5960-3759)
DLA - CC
Review activities:
Army - AR
Navy - AS, CG, MC, OS
Air Force - 99
NOTE: The activities listed above were interested in this document as of the date of this document. Since
organizations and responsibilities can change, you should verify the currency of the information above using the
ASSIST Online database at https://assist.daps.dla.mil.
8
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business