MIL-PRF-1/1331F
TABLE I. Testing and inspection - Continued.
8/
Test to be performed every three months, using the following sampling plan:
n1 = 4
c1 = 0
Separate samples may be used at the option of the manufacturer, and the tests shall be considered as nondestructive except in
case of failure. In case of failure, after sampling, the failing test shall become a conformance inspection, part 2, acceptance level
6.5 (see 10/) for three consecutive successful submissions, at which time the testing may revert to the periodic-check test basis.
9/
This test shall be performed during the initial production and once each succeeding 12-calendar months in which there is
production. An accept on zero defect sampling plan shall be used, with sample of three tubes with an acceptance number of zero.
In the event of failure, the test will be made as a part of conformance inspection, part 2 (see 10/), with an acceptance level of 6.5.
The "12-calendar month" sampling plan shall be reinstated after three consecutive samples have been accepted.
10/
This specification sheet uses an accept on zero defect sampling plan in accordance with MIL-PRF-1, table III.
5
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.