MIL-PRF-1/1232E
TABLE I. Testing and inspection.
Method
Limits
Inspection
MIL-STD-1311
Notes
Test
Conditions
Symbol
Min
Max
Unit
Preproduction sample
approval inspection
Humidity
1011
---
---
---
---
---
---
Degradation due to
4021
---
---
t = 1 hour
---
---
---
---
vibration
Mechanical insertion
---
1/ 3/
---
---
---
---
---
Conformance inspection,
---
part 1
Ii = 100 µA dc
Ignitor voltage drop
4406
---
---
Eid
275
475
V dc
Spike-leakage energy
4452
---
1
Ws
---
0.25
erg
Flat-leakage power
4452
---
1
pf
---
75
mw
Temperature cycling
1027
---
---
---
---
---
---
(nonoperating)
Ignitor ignition time
4401
---
---
Ebb = -750 V dc;
t
---
5.0
sec
Ri = 4.5 Meg
σ
Low-level VSWR
4473
4/
---
F = (F1, F2, F3, F4,
---
1.3
---
and F5) ± 0.1%
Arc loss
4488
---
1
La
---
0.3
dB
Conformance inspection,
part 2
Dielectric material strain
4101
---
---
---
---
---
---
F = F3 ± 5%
Insertion loss
4416
---
---
Li
---
0.5
dB
ĆIi = 100 µA dc
ĆLi
Ignitor interaction
4421
---
---
---
0.2
dB
Ignitor noise ratio
4460
---
---
Fo = 1,300 MHz;
Nr
---
1.3
---
Ii = 100 µA dc
µs
Recovery time
4471
---
2
t
---
20
See footnotes at end of table.
2
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business