MIL-PRF-1/95E
TABLE I. Testing and inspection.
Limits
Requirement or test
Conditions
Symbol
MIL-STD-1311
Unit
Min
Max
Conformance
inspection, part 3
---
---
---
---
---
Group C; triode connected
Life-test provisions
---
Ep
0.22
---
V ac
Voltage gain
Life-test end points
5x10-13
Ic1
---
A dc
Total grid current
(500 hours):
---
---
---
---
Group C; triode connected
Life-test provisions
---
(see note 3)
Ep
0.22
V ac
---
Life-test end point
Voltage gain
---
(10,000 hours)
NOTES:
1.
Measurement shall be made with tube in an electrostatically shielded, light-tight container. One hour pre-heating is
permitted prior to testing.
2.
This test to be performed at the conclusion of the holding period.
Referenced documents. In addition to MIL-PRF-1, this document references the following: MIL-STD-1311.
The margins of this specification are marked with vertical lines to indicate where changes from the previous issue were made. This
was done as a convenience only and the Government assumes no liability whatsoever for any inaccuracies in these notations.
Bidders and contractors are cautioned to evaluate the requirements of this document based on the entire content irrespective of the
marginal notations and relationship to the last previous issue.
Custodians:
Preparing activity:
Army - CR
DLA - CC
Navy - EC
Air Force - 85
(Project 5960-2013-001)
DLA - CC
Review activities:
Army - AV, MI
Navy - AS, CG, MC, OS
Air Force - 19, 99
NOTE: The activities listed above were interested in this document as of the date of this document. Since organizations and
responsibilities can change, you should verify the currency of the information above using the ASSIST Online database at
3