MIL-PRF-1/1709B
TABLE I. Testing and inspection.
Limits
Inspection
Method
Notes
Test
Conditions
Symbol
Min
Max
Unit
Conformance inspection,
1/
---
part 1
Low level VSWR
4473
2/
---
σ
---
1.9
F1
---
σ
---
1.4
F2
---
σ
---
1.4
F3
---
σ
---
1.4
---
F4
σ
---
1.9
---
F5
σ' = 1.05
Insertion loss
4416
---
---
F = F3
Li
---
0.5
dB
Po = 4 kw ±10 percent
Flat leakage power,
4452
3/
2
Pb
---
100
mw
peak (max)
Flat leakage power
4452
---
2
pf
---
50
mw
Spike leakage energy
4452
---
2
Ws
---
0.10
erg
±0.015
Position of short
4494
4/
2
Distance
---
Inch
Arc loss
4488
---
1
Loss
---
0.80
dB
Temperature cycling
1027
---
---
1 cycle
---
---
---
---
(nonoperating)
Conformance inspection,
part 2
Dielectric material strain
4101
5/ 6/
---
---
---
---
---
µs
Recovery time
4471
---
3
t
---
5
Conformance inspection,
part 3
Life test (1)
---
8/
3
Group D
t
4,000
---
hrs
Life test (2)
---
---
3
Group D
t
1,000
---
hrs
Life (1 and 2) test
---
end points:
µs
Recovery time
4471
---
3
t
---
10
Flat leakage power
4452
---
2
pf
---
70
mw
Spike leakage energy
4452
---
2
Ws
---
0.1
erg
Insertion loss
4416
---
---
F = F3
Li
---
0.8
dB
Temperature cycling
1027
9/
---
10 cycles (min);
---
---
---
---
life test
Group C
See footnotes at top of next page.
2
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business