MIL-PRF-1/1341A
TABLE I. Testing and inspection.
Limits
Acceptance level
Requirement or Test
Notes
Conditions
Symbol
Unit
( See note 10)
Minimum
Maximum
General
Preproduction Sample
3
Approval
Performance
Holding period
Cathode-Ray tubes
(Preheating)
Dimensions
(for cathode Ray tubes)
(see figure 1)
Container drop
(Cathode Ray tubes)
Preproduction Sample
3
Approval Inspection
Base connections
Pressure
45 Ib/sq. in
Width
1.0
mm
Cathode-Ray vibration
---
μf
Direct Interelectrode
g1 to all
----
C
---
6
μf
Capcitance
D1 to D2
----
C
---
4
μf
D3 to D4
-----
C
---
4
μf
D1 to all
----
C
---
7.5
μf
7.5
D2 to all
----
C
---
μf
6.0
D3 to all
----
C
---
μf
6.0
D4 to all
----
C
---
Cathode Illumination
Acceptance Inspection
Part 1
Electride Currents
μA dc
Ib1
-15
10
Anode No. 1 Current
EcL=0
μA dc
Cathode current
Light = 20 ft.L
Ik
---
1000
Voltage breakdown
Ef = 1.65 V
---
---
---
---
Voltage breakdown
(electrostatic types)
--
Light = 20 ft.L
---
Gas " Cross"
----
---
---
---
---
Blemishes
---
---
light outout
2
(See note 4)
Light 20
ft. L
ĆEc1
Modulation
Light = 20 ft.L
Vdc
38
Spot position
15.0
mm
(electrostatic deflection)
Spot displacement
--
Displ
7.0
mm
(Leackage)
2
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business