MIL-PRF-1/1329A
TABLE I. Testing and inspection - Continued.
18/ This test shall be performed on four tubes per month when the tube is in continuous production, but shipments of that month's
production shall not be held pending completion of this test. So long as three of the four tubes for each of the first three months of a
production run pass the test and 75 percent of the cumulative quantity of tubes tested pass the test, tubes shall be considered to
conform to this specification. If either of the conditions are not met, shipments shall be halted until three of four tubes of current
production conform to the test.
19/ The tube shall pass all applicable production tests at the end of the specified life, with the condition that the criteria for acceptance
be modified in accordance with the life test end points listed.
20/ Referenced documents shall be of the issue in effect on the date of invitation of bids.
21/ The preproduction sample approval requirements in U. S. Army Electronics Command Drawing, SC-A-46600B hereby replace any
qualification requirements referable to the product covered herein. However, the requirements of 3.1.2.1, 3.1.2.2, 3.1.3, and 4.4 in
Drawing SC-A-46600B shall be considered not applicable to the product covered herein.
(Copies of U. S. Army Electronics Command Drawing SC-A-46600B, 19 March 1965, "Preproduction Sample Approval in Lieu of
Qualification Requirements in Specifications for Semiconductor Devices and Electron Tubes" may be obtained from the acquiring
activity or as directed by the contracting officer.)
22/ Product-identification marking shall be in accordance with MIL-PRF-1. If any document waiver has been granted, the product-
identification marking shall consist of the tube-type designation only.
23/ Tubes shall be prepared for domestic or overseas shipment, as specified in the contract or order, in accordance with MIL-PRF-75/1.
(See 20/)
NOTICE:
When Government drawings, specifications, or other data are used for any purpose other than in connection with a definitely
related Government acquisition operation, the United Stated Government may have formulated, furnished, or in any way
supplied the said drawings, specifications, or other data is not to be regarded by implication or otherwise as in any manner
licensing the holder or any other person or corporation, or conveying any rights or permission to manufacture, use, or sell any
patent invention that may in any way be related thereto.
5
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business