MIL-PRF-1/1071D
TABLE I. Testing and inspection - Continued.
1/ Suitable rf gaskets will be supplied with each tube.
2/ The number of first article (preproduction) samples required for inspection and the acceptance criteria shall be as specified for
qualification testing in the basic document. All tests listed on the tube specification sheet are required for first article
(preproduction) inspection; however, those tests grouped under this heading are to be performed during preproduction testing
only.
3/ This test shall be performed in a half-height L-band waveguide (ID 6.500 inches (165.10 mm) x 1.625 inches (41.28 mm)).
4/ Unless otherwise specified, the acceptance level for all tests listed under conformance inspection, part 1, shall be 1.0 percent,
inspection level II.
5/ The tube shall be capable of being inserted and removed from its seat a minimum of 15 times with no deterioration in the tube
electrical characteristics.
6/ This test shall be performed in a full-height L-band waveguide (ID 6.500 inches (165.10 mm) x 3.250 inches (82.55 mm)).
3
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business