MIL-PRF-1/61D
TABLE I. Testing and inspection - Continued.
NOTES:
1.
See "Reduced pressure (altitude) rating", and altitude, maximum peak voltage.
2.
This test to be performed at the conclusion of the holding period.
Signal coupled to grid through 1 µF capacitor.
3.
4.
Tube types 6SK7GTY and 12SK7GTY are hereby deleted from this specification sheet. For acquisition purposes, use
tube type 6SK7WA for tube type 6SK7GTY and tube type 12SK7 for tube types 12SK7Y and 12SK7GTY.
5.
This specification sheet uses accept on zero defect sampling in accordance with MIL-PRF-1, table III.
Custodians:
Preparing activity:
Army - CR
DLA - CC
Navy - EC
Air Force - 11
(Project 5960-2007-002)
DLA - CC
Review activities:
Army - AR, CR4
Navy - AS, CG, MC, OS, SH
Air Force - 99
NOTE: The activities listed above were interested in this document as of the date of this document. Since organizations and
responsibilities can change, you should verify the currency of the information above using the ASSIST Online database at
3
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business