MIL-PRF-1/26E
TABLE I. Testing and Inspection. - Continued.
NOTES:
1. Unless otherwise specified, the acceptance level for all tests listed under conformance inspection, part 1, shall
be 1.0. (This specification sheet uses accept on zero defect sampling plan in accordance with MIL-PRF-1, table III.)
2. A swept-frequency method may be used for this test.
3. W hen the metal plate is replaced by the tube, the position of the voltage standing wave minimum of the flat
position of the pulse shall be 0.065 inch (1.65 mm) further from the magnetron within the limits specified.
4. This test shall be conducted with the TR tubes mounted in a rat-race duplexer under the conditions specified.
There shall be no arcing across the front face of the window during this test.
3
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business