MIL-E-1/83H
GENERAL:
Qualification: Not required.
This specification sheet uses accept on zero defect sampling in accordance with MIL-PRF-1, table III.
Reliable tube.
Holding period in accordance with MIL-STD-1311: t = 24 hours.
TABLE I. Testing and inspection.
Limits
Method
Requirement or test
Units
Conditions
Symbol
MIL-STD-1311
Min
Max
Conformance inspection,
part 1
Short and discontinuity
1201
---
---
---
---
detection
Heater current
3241
If
550
650
mA
µA dc
Heater-cathode leakage
1336
Ehk = +25 V dc
Ihk
---
15
µA dc
Ehk = -100 V dc
Ihk
---
15
Critical grid voltage for
3201
Epp = 460 V ac;
Ecc1
-2.9
-4.5
V dc
Rg1 = 0.1 MegΩ;
conduction (1)
Rp = 3,000 ohms
3/ 5/ 6/
Critical grid voltage for
3201
Epp = 460 V ac;
Ecc1
---
-5.2
V dc
Rg1 = 10 MegΩ;
conduction (2)
Rp = 3,000 ohms
5/ 6/
Critical anode voltage for
3201
Ecc1 = 0;
Ebb
---
38
V dc
Rg1 = 0.1 MegΩ;
conduction (1)
Rp = 1,000 ohms 5/
Critical anode voltage for
3201
Ef = 0;
Ebb
650
---
V dc
conduction (2)
Ecc1 = -100 V dc;
Rg1 = 0;
Rp = 10,000 ohms
5/ 7/
e = 180 ± 9 v;
Pulse emission
1231
etd
---
76
v
t = 3 sec (max);
Rp = 10 ohms;
Ra = 15 ohms;
Zm = 7.5 ohms;
prr = 100 ±5;
calibrating resistor
= 5 ohms
See footnotes at end of table.
2
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business